Case Studies

You are in
Images in Branxton Weighbridge

Scope of works

Installation of three pits, 55m trenching, 118m conduit, and concrete slab.

Challenges

On site location of signal cabling, CCTV cabling as well as various redundant cables demanded extra precautions.

Solutions

Deliberate care and slow excavation around the existing and redundant cabling ensured a safe and non-destructive  outcome for services.