Case Studies
Images in Branxton Weighbridge
Scope of works
Installation of three pits, 55m trenching, 118m conduit, and concrete slab.
Challenges
On site location of signal cabling, CCTV cabling as well as various redundant cables demanded extra precautions.
Solutions
Deliberate care and slow excavation around the existing and redundant cabling ensured a safe and non-destructive outcome for services.